This week the guys tackled the second bathroom. These are before and after shots. Before included no water or electric connections. After included completed toilet connections, bathtub water but no drainage connection as yet and basin stuff still not connected. Some tiling still needing completing but at least we have another working loo :)
While Mmalae tackled most of the tiling, Mark worked on connecting water piles etc in bathroom and finished overhead light connections in the walls in this bathroom, the spare room, school room and TV room. He still needs to connect the outlet points. But, enough was done that we could move into all the rooms and start unpacking. We'll just make do without celings in passage, second bathroom, second lounge area, school room, spare room and TV area until Mark can get go them. Mark also hung some kitchen cupboards on the walls in the kitchen, which aided more unpacking.
Mmalae is now taking a 2 or so week break. He will come back for short periods as Mark needs him and his other work allows. Tho Mark too is wanting to take a break from the pressure of 12 hour days and keeping Mmalae going. Will keep you updated as things start again.